Nicholas AndreouBarrister, Victorian Bar

Meridian Retail v Australian Unity Retail Network [2006] VSC 223

Supreme Court of Victoria, 21 June 2006. Dodds-Streeton J.

In the Commercial and Equity Division of the Supreme Court of Victoria, Dodds-Streeton J held after a trial that a franchisee's claims against its franchisor's termination of the franchise should be dismissed, finding no breach of an implied term of good faith on any articulation of it and leaving undecided whether such a term was implied [214], [222], [223].

What the court decided

Meridian operated an Australian Unity franchise at the Chadstone Shopping Centre under a franchise agreement dated 10 October 2003 [1]. The franchisor could, in its absolute discretion and by notice in writing, remove or add Products, including Essential Products [25]. It could terminate on three months' notice where, in its reasonable opinion, the network was no longer viable as contemplated, with significant change compensation then payable [26].

On 21 April 2005 the franchisor's Mr Stow addressed a meeting of franchisees at its head office [105]. His evidence was that he said existing agreements would be honoured but that on rollover the franchisor would look to new agreements "much more financial planning centric" [106]. The plaintiff's witnesses said that he stated, or conveyed the impression, that health insurance, general insurance and banking products would be withdrawn after the initial term [7]. By the date of the notice of termination the plaintiff was the only remaining franchisee in a network that had comprised ten franchises [4]. The notice was dated in October 2005 and was effective from 30 June 2006 [1].

The plaintiff alleged that the franchisor had engineered the significant change to force out the franchisees, in breach of an implied term of good faith [5]. It also alleged contraventions of section 52 and section 51AC of the Trade Practices Act 1974 (Cth) [8]. At trial it argued that the franchisor could not rely on non-viability because that condition had been achieved by its earlier breach [14].

Her Honour preferred the evidence of Mr Stow and of Ms Guy, a manager in the Australian Unity group who also attended, where it conflicted [109], [140]. She was not persuaded that he stated that health insurance products would be removed after rollover, or at all [215]. The statements he gave evidence of making could not reasonably be construed or intended as a threat to render the franchise businesses unviable [144].

Three franchises were surrendered before, and unconnected with, the meeting [215]. The plaintiff did not surrender its franchise as a result of statements made at the meeting [215]. Three franchisees surrendered as a result of the meeting, but not because of improper, unfair or unreasonable conduct or a threat of it [216]. The franchisor did not bully or pressure those three to surrender or to accept unfair terms or an unfair price [216]. Mr Stow formed the view on reasonable grounds that the network was non-existent or unviable, entitling the franchisor to serve the notice [217]. Her Honour was not persuaded that, although he desired the end of the franchises, he engaged in any improper, exploitative or unfair conduct to achieve it [218].

The franchisee had no contractual entitlement to an extension on the same terms, and the franchisor had an absolute discretion to add or remove products [219], [220]. Its intention to change conditions after rollover was an intended exercise of its contractual powers for a legitimate commercial purpose [221].

It was not established that these franchisees were vulnerable or substantially disadvantaged, though her Honour noted authorities indicating that implication may be particularly appropriate in franchise relationships [211]. In remarks not necessary to the decision, she considered that, assuming vulnerability, the term would preclude using or threatening to use the "literally unqualified power" to remove a vital product to secure a premature end at an undervalue [212]. In the same remarks she considered that if a breach materially contributed to satisfying the termination precondition, equity would preclude reliance on it or treat it as tainted [213]. It was unnecessary to decide whether the term was implied, because there was no breach on the facts found [214].

The Trade Practices Act claims were likewise not established on the facts [222]. The franchisor was entitled to serve, and may rely upon, its notice of termination, so the claims should be dismissed [223].

Why it matters

The result is fact-bound: the franchisor's opinion of non-viability was formed on reasonable grounds after every other franchisee had surrendered, and the existence of the term was left open [214], [217]. Her Honour's remarks, made on the assumption that the franchisees were vulnerable, suggest that threatening such a power to force franchisees out at an undervalue would breach the term, and that a franchisor may be unable to rely on a condition its own breach helped satisfy [212], [213].

Numbers in square brackets are paragraph numbers of the judgment. This note summarises a decided case for education and is not legal advice. See how the notes are written.